MSS347Series2Bx10Fd6001_Page 1 |
Save page Remove page | Previous | 1 of 28 | Next |
|
This page
All
Subset |
Loading content ...
Design Workshop, Inc.
Landscape Architecture
Land Planning
Lrban Design
Tourism Planning
9621 4th Street NW
Albuquerque, New Mexico
87114
Telephone
505 890-1815
Facsimile
505 890-1817
Aspen
Denver
Phoenix
Santa Fe
Sao Paulo
Vail
Phase 3A Punch List
To: Jack Eichorn
Dave Daniel
Mike Bacca
^33^10
T^-__lf?
i—
From: Anne Desjardin
Date: August 23, 1996
Based on our walk through today, the following items need to be completed to close
out Phase 3A:
Academy Road between Imperata and Tramway
• Turn path to either side of barricade to meet crosswalk at intersection of
Academy Road and Imperata.
• Smooth down 'banks' on edges of path
• Transplant bear grass and mountain mahogany (2)
• Disk and reseed 'scar' on west end of Academy
• Trim dead branches off transplanted apache plume
• Various areas need fine grading
• Repair guy wire on pinon
Spain Road between Imperata and Tramway
• Trim apache plume extending into path
• Remove various concrete remnants
• Grade flush at wheelchair ramp at intersection of Cortaderia and Spain
• Trim steel edging at same intersection
• Move 'seat rock' to Phase 4 flagstone area
• Replace dead bear grass
• Hold off planting chamisa and apache plume near Tramway
Please let me know if you have any questions.
DESIGNWORKSHOP
Object Description
Description
Tags
Comments
Post a Comment for MSS347Series2Bx10Fd6001_Page 1
