Skip to main content

Add or remove other collections to your search:



Narrow your search by:



You've searched: All Collections

  • All fields: (Environmental
(468 results)



Display: 100

    • Environmental Study, scope of work for Logan Canyon

    • Exhibit A of the Logan Canyon environmental study scope of work that lists the numerous tasks to be completed for the project including an analysis of transportation needs such as safety, maintenance, and congestion; location studies from specific...
    • Logan Canyon (Utah); Roadside Improvement--Utah--Logan Canyon; United States Highway 89;
    • Introduction to Highway 89 study

    • An 8 page project introduction by the Utah Department of Transportation (UDOT) that outlines the purpose of the Logan Canyon study, listing three main objectives; the backgroud and description of the Logan Canyon study; a schedule, including a list...
    • Logan Canyon (Utah); United States Highway 89; Utah; Roadside improvement--Utah--Logan Canyon;
    • Various papers commenting on the Logan Canyon construction project, 1994

    • Various papers commenting on the Logan Canyon construction project, 1994. Included: Citizens for a Safe and Scenic Logan Canyon summary of UDOT plan of action and Conservationist plan of action, time filing lawsuit under NEPA, and comments on Logan...
    • Traffic engineering; Roadside improvement--Utah--Logan Canyon; Logan Canyon (Utah);
    • Correspondence from Brian Beard to Vern Hamre, November 21, 1979

    • Correspondence from Brian Beard to Vern Hamre questioning who is the lead agency - UDOT or the Forest Service - in the road construction activities proposed for Logan Canyon. He also requests an evaluation of the environmental issues.
    • Environmental policy; Government agencies; Logan Canyon (Utah);
    • Correspondence and status update on Logan Canyon

    • Correspondence from Bryan Dixon to Rudy Lukez, March 28, 1987; correspondence from Jay A. Monson to James (Jim) Naegle; and the Logan Canyon Highway project status and issues with a history of the project, timline, alternatives being considered,...
    • Traffic engineering; Environmental policy; Roads Improvement--Utah--Logan Canyon;
    • Logan Canyon Environmental Study

    • The transcript of a public meeting held to answer questions concerning the devleopment of the Logan Canyon.
    • Logan Canyon (Utah); Roads Improvement--Utah--Logan Canyon; United States Highway 89;
    • Public scoping meeting for the Logan Canyon environmental study

    • Transcript from the public scoping meeting for the Logan Canyon environmental study held at City Hall in Garden City, Utah on March 10, 1986 where several spoke and answered questions.
    • United States Highway 89; Logan Canyon (Utah)--History; Roadside improvement--Utah--Logan Canyon;
    • Correspondence from Brian Beard to Gary Lindley, November 21, 1979

    • Correspondence from Brian Beard to Gary Lindley regarding the proposed construction activities in Logan Canyon. The Sierra Club is concerned about UDOT's compliance with NEPA and wants to have an Enviromental Assessment drawn up.
    • Logan Canyon (Utah); Government agencies; Environmental policy;
    • Horizon Uptown_CSDA_submittal sm

    • "Horizon Uptown’s Central Park is a 45-acre park at the center of the first urban, mixed-use sustainable community for the City of Aurora, Colorado. The 500-acre community will include approximately 3,800 homes, 3 million square feet of commercial...
    • Sustainability; Landscape architecture; Regional Planning;
    • Nature's Second Course: Water Culture in the Mormon Communities of Cache Valley, Utah, 1860-1916

    • Nature's Second Course: Water Culture in the Mormon Communities of Cache Valley, Utah, 1860-1916 by Kathryn T. Morse. A thesis submitted in partial fulfillment of the requirements for the degree of Master of Arts in History, Utah State University,...
    • Canals--Cache Valley (Utah and Idaho)--History; Canals--Utah--History; Water rights--Utah--Cache County--History; Water resources development--Utah--History; Mormons--Utah--Social life and customs; Logan River (Utah)--Water rights;
    • Agenda and memorandums, July - December 1986

    • Ten memorandum cover pages from Stan Nuffer summarizing the minutes from the 3rd, 4th, 5th, 6th, 7th, 8th, 10th, 11th, 12th, and 13th Interdisciplinary Team meetings. Also three agendas for public meeting No. 1 in Logan City Hall, additional data...
    • Logan Canyon (Utah); Logan Canyon (Utah)--History; Logan Canyon Study; Roads Improvement--Utah--Logan Canyon; United States Highway 89; Utah;
    • Additional data for agenda items from January 26, 1987 Interdisciplinary Team meeting

    • Additional data for agenda items from January 26, 1987 Interdisciplinary Team meeting includes an environmental report schedule, outline for scoping meeting, list of figures for slide presentation for scoping meeting, environmental impact statement...
    • Logan Canyon (Utah); Traffic engineering; Roadside improvement--Utah--Logan Canyon; Roads--Design and construction; United States Highway 89;
    • Correspondence from Brian Beard to David Watt, November 21, 1979

    • Correspondence from Brian Beard to David Watt asking for a copy of the "finding of no significant impact" and asking for information as to why UDOT decided to proceed without an Environmental Assessment as required by CEQ NEPA.
    • Environmental policy; Government agencies; Logan Canyon (Utah);
    • Correspondence from Brian Beard to George Bohn, November 21, 1979

    • Correspondence from Brian Beard to George Bohn requesting that any and all information regarding Utah Department of Transportation's compliance with NEPA be sent for review, espeicially as to why Logan Canyon was removed from a Category I and put...
    • Environmental policy; Government agencies; Logan Canyon (Utah);
    • Evaluation of preconstruction and environmental analysis

    • Evaluation of preconstruction of Logan Canyon including diagrams of the suggested widening of lanes and a detailed list of stations and their modifications. Also included is an environmental analysis report for Old Juniper Trailhead by Clark...
    • Logan Canyon (Utah); Traffic engineering; Roadside improvement--Utah--Logan Canyon;
    • Idarado-award submittal

    • "The fundamental purpose of the Idarado Legacy project is to create a redevelopment plan for a former mining site. After listening closely to what was said at community user meetings, the landscape architects conceived of the idea of creating a...
    • Landscape architecture; Regional Planning;
    • Concern about Logan Canyon

    • Detailing the concerns, particularly from environmental groups, of the expansion and reduction of curves in Logan Canyon including a general summary, traffic growth factors, safety factors, and environmental factors. Important addresses and...
    • Environmental policy; Traffic engineering; Logan Canyon (Utah);
    • Avon-Cutsheets

    • "Through public process, design standards and a redevelopment plan, Avon station and Lake Street were emphasized to influence the momentum and redevelopment of West Town Center. Design Workshop worked with the community to create goals and...
    • Community; Urban renewal; Local transit
    • Minutes of June 23, 1986 Interdiscipline Team meeting

    • Minutes of June 23, 1986 Interdisciplinary Team meeting. Review of minutes, discussion of role of Interdisciplinary Team, level of documentation required, public involvement program outline, and the schedule.
    • United States Highway 89; Roadside Improvement--Utah--Logan Canyon;
    • Summary fact sheet Highway 89, 1986

    • Four page fact sheet of the Logan Canyon Study from November 1986 by Utah Department of Transportation and CH2M HILL summarizing the area's transportation needs, roadway conditions, safety, and maintenance. Also included are graphs and tables...
    • Logan Canyon (Utah); United States Highway 89; Utah; Roadside improvement--Utah--Logan Canyon; Roads--Design and construction;
    • Fact sheet for Logan Canyon, Feburary 1987

    • Fact sheet for Logan Canyon prepared by CH2M Hill on Feburary 1987 explaining the reasons for improvements, and the proposed alternatives for each section including maps and graphs.
    • Traffic engineering; Roads--Design and construction;
    • Ted Seeholzer interview, 19 November 2008, and transcription;

    • Ted Seeholzer is the owner of the Beaver Mountain ski area in Logan Canyon and talks about the history of Beaver Mountain (which has been owned by his family since its inception), and his varying roles with the ski resort – beginning in childhood....
    • Seeholzer, Ted, 1932---Interviews; Seeholzer, Ted, 1932---Family; Seeholzer, Ted, 1932---Career in the Ski Industry; Beaver Mountain Ski Resort (Logan Canyon, Utah)--History; Beaver Mountain (Utah); Fishing--Utah--Logan River; Hunting--Cache Valley...
    • Correspondence from M.J. Roberts to Brian Beard, November 26, 1979

    • Correspondence from M.J. Roberts to Brian Beard regarding the proposed 3rd phase reconstruction of the Logan Canyon Highway mentioning that no campgrouds will be built at Ricks Springs or Wood Camp Hollow, how fill material will be disposed of, and...
    • Logan Canyon (Utah); Public lands--Utah--Logan Canyon;
    • blue lake award submittal

    • "Metro Regional Parks and Greenspaces contracted Design Workshop Golf in the summer of 2006 to develop a series of conceptual golf routing plans for a new Golf Learning Center at Blue Lake Park in Fairview, Oregon. Design Workshop Golf proposed an...
    • Golf Courses, Landscape architecture
    • Correspondence from Bruce Pendery to Dave Berg, August 12, 1994

    • Correspondence from Bruce Pendery to Dave Berg stating the reasons why a supplemental environmental impact statement (SEIS) should be prepared, explaining that flawed data and lack of public involvement have made the current EIS unusable. Suggests...
    • Logan Canyon (Utah); Natural resources conservation areas; Traffic engineering; Roadside improvement--Utah--Logan Canyon;
    • Wildcat Ranch-award_cutsheet

    • "Through a collective vision of the client, landscape architects, consultant team and the public, the 6,800-acre Wildcat Ranch was planned to redefine the legacy of land in the American West, preserve significant threatened land in perpetuity and...
    • Landscape architecture; Regional Planning;
    • Public correspondence from Federal Highway Administration, February 11, 1987

    • Public correspondence from Federal Highway Administration, February 11, 1987 stating when and where public scoping meetings will be held, CH2M Hill's role in the Logan Canyon study, general proposed improvements along the Canyon Road, and who to...
    • Logan Canyon (Utah)--History; Roads--Design and construction; Roadside Improvement--Utah--Logan Canyon; United States Highway 89;
    • Correspondence from Dale Bosworth to Daniel Dake, May 28,1987

    • Correspondence from Dale Bosworth to Daniel Dake, May 28,1987 discussing how the EIS must comply with the Wasatch-Cache National Forest Land and Resource Management Plan. Bosworth states that the Forest Service supports an objective analysis of...
    • Logan Canyon (Utah); Utah; United States Highway 89;
    • Last Chance for Logan Canyon

    • Information regarding a vigil being held in Logan Canyon, donation opportuinites, twelve reasons to oppose the preferred alternative for Logan Canyon, and a summary of the preferred alternative.
    • Natural resources conservation areas; Logan Canyon (Utah);
    • Dave Baumgartner interview, 5 May 2008, and transcription;

    • The interview contains information on the childhood, education and the career of Dave Baumgartner as a forester, the various positions held within the Forest Service and his views on management. There are many anecdotes from his personal...
    • United States. Forest Service; United States. Forest Service--Officials and employees; Foresters--Interviews; Baumgartner, Dave, 1942---Interviews; Baumgartner, Dave, 1942---Family; Baumgartner, Dave, 1942---Career in Forestry; Logan Canyon (Utah);...
    • Environmental Conditions Projections

    • Environmental Conditions Projections, a working paper, March 1977. This report written in 1977 forecasts environmental data for the years 1985 and 2020 for the Bear River Watershed. Work on this project was performed between July 1, 1974 and...
    • Bear River (Utah-Idaho); Bear River (Utah-Idaho)--Environmental conditions; Bear River Watershed (Utah-Idaho); Bear River Watershed (Utah-Idaho)--Environmental conditions
    • Correspondence from George Bohn to Brian Beard, December 12, 1979

    • Correspondence from George Bohn to Brian Beard defining the action plan which must comply with various legislative requirements such as NEPA, and outline how the State will coordinate with other government entities and the public in developing...
    • Environmental policy; Logan Canyon (Utah); Government agencies;
    • Temixco cutsheets

    • "Design Workshop master planned an 1,800 acre new City in Mexico. The new community will include new government centers, significant employment centers, a series of villages and districts, and a variety of open space amenities, including a golf...
    • Regional Planning; Landscape architecture; Urban renewal;
    • Alternatives to proposed Logan Canyon construction

    • Several alternatives to the proposed construction in Logan Canyon including: concern over the expansion and curve reduction in Logan Canyon, Agency Alternative, Additions to Conservationists' alternative for US 89, Environmentalists' alternative,...
    • Traffic engineering; Roadside improvement--Utah--Logan Canyon; Logan Canyon (Utah);
    • Aquatic resources technical memorandum, Logan Canyon

    • Aquatic resources technical memorandum prepared for Utah Deparment of Transportation detailing the existing conditions of the aquatic habitat, fisheries biology, water quality, the impacts and mitigation in the Middle and Upper Canyons and Rich...
    • Aquatic resources--Utah--Logan River; Logan Canyon (Utah); Fishery resources; Logan River (Utah);
    • Correspondence from Brian Beard to M.J. Roberts, November 21, 1979

    • Correspondence from Brian Beard to M.J. Roberts regarding the camp grounds that are proposed for construction parallel with the road construction and asking what is to be done regarding the disposal of fill material. Also asks how they intend to...
    • Environmental policy; Government agencies; Logan Canyon (Utah);
    • Logan Canyon Bulletin, January 1991

    • Encouraging citizens to write to James Naegle requesting copies of the draft Environmental Impact Statement and support the protection of Logan Canyon.
    • Environmental policy; Logan Canyon (Utah);
    • Correspondence from M.J. Roberts to Marta Tollerup, December 20, 1979

    • Correspondence from M.J. Roberts to Marta Tollerup discussing the changes to China Row picnic site, Woodcamp campground, Cottonwood picnic site, Twin Bridges campground, and two summer recreation residences including the aspects of recreation and...
    • Outdoor recreation; Logan Canyon (Utah); Traffic engineering;
    • Report on Highway 89

    • A three page typed report investigating the popular opinion of the proposed changes in Logan Canyon on Highway 89.
    • Logan Canyon (Utah); Public Lands--Utah--Logan Canyon; Roadside Improvement--Utah--Logan Canyon; United States Highway 89; Logan (Utah);
    • Minutes from December 8, 1986 Interdisciplinary Team meeting

    • Minutes from December 8, 1986 Interdisciplinary Team meeting. Review of minutes, discussion of issues and concerns, discussion of schedule for completion of the scoping process, update of final visual classification, and layouts for component...
    • United States Highway 89; Roadside Improvement--Utah--Logan Canyon; Traffic engineering;
    • Summary Report Bear River Basin Cooperative Study

    • Summarizes about 22 reports prepared as the result of the cooperative study of the Bear River Basin in Utah, Idaho, and Wyoming in the mid-1970s. Describes the Bear River Basin and some of its problems in areas such as economics, recreation,...
    • Bear River Watershed (Utah-Idaho)--Statistics; Bear River Watershed (Utah-Idaho)--Maps; Land use--Bear River Watershed (Utah-Idaho); Water-supply--Bear River Watershed (Utah-Idaho); Bear River (Utah-Idaho)--Environmental conditions--Statistics;...
    • Lafitte_ASLA Nationals 2012 sm

    • "As one of the first revitalization projects since the devastation of 2005’s Hurricane Katrina, the 3.1- mile linear Lafitte Greenway will become a vibrant, multi-modal transportation corridor linking residents to the heart of New Orleans. The...
    • Urban renewal; Brownfields; Regional Planning; Landscape architecture;
    • An analysis of the proposed re-alignment of U.S. 89 in Logan Canyon, Utah.

    • A Citizens for the Protection of Logan Canyon analysis of the proposed re-alignment of U.S. 89 in Logan Canyon. Critique of UDOT traffic forecasts by Dr. David Schmipf, Critique of UDOT safety statements by Dr. Jack T. Spence, and a commentary on...
    • Traffic engineering; Roadside improvement--Utah--Logan Canyon; Logan Canyon (Utah);
    • John Neuhold interview, 11 April 2008, and transcription;

    • The interview includes some personal background information, but mostly discusses John Neuhold's professional life and education. He also talks about his mentors and work in Wisconsin, but mostly his work in Utah, including a project with the...
    • Bear River (Utah-Idaho); Neuhold, John M.--Interviews; Neuhold, John M.--Family; Neuhold, John M.--Career in Ecology; Logan Canyon (Utah); Plant ecology--Research; Fishery management--Research--Utah; Lake ecology--Research--Utah; Stream...
    • The State Role in Western Watershed Initiatives

    • A review of the modem watershed management movement in the West focusing on the role that state governments play in watershed initiatives (quoted and paraphrased from document).
    • Watershed management -- West (U.S.); Watersheds -- Multiple use -- West (U.S.); Water quality management -- West (U.S.);
    • Park Avenue cutsheets

    • "The Park Avenue Redevelopment Project represents a major step in the redevelopment process for the South Lake Tahoe community. Situated at the edge of an alpine lake of significant beauty and environmental value. Design Workshop's recommendations...
    • Resorts; Landscape architecture; Regional Planning;
    • Memorandum from Stan Nuffer, April 29, 1987

    • Memorandum from Stan Nuffer with the review of traffic forecasts, scoping comments, dates for meetings, technical memorandum on noise and speed analysis.
    • Logan Canyon (Utah); Roads--Design and construction; Traffic engineering;
    • Sand Point RFU

    • "Live, outdoor performances have been held in the natural setting at Sand Harbor State Park for the past 20 years, while efforts have continued to restore the naturally functioning environmental systems of the area. The final design includes:...
    • Landscape architecture; Regional Planning;
    • Logan Canyon highway: Important names

    • List of district officals, UDOT managment team, Utah highway environmental council, and Federal Highway Administration.
    • Logan Canyon (Utah); United States Highway 89; Government agencies;
    • Minutes from July 31, 1987 Interdisciplinary Team meeting

    • Minutes from the 24th Interdisciplinary Team meeting on July 31, 1987 at UDOT district office in Ogden, Utah. Also included is a corrected Figure 6-1 for Traffic Capacity Technical Memorandum and labeled map, and written comments on Visual...
    • United States Highway 89; Roadside Improvement--Utah--Logan Canyon; Traffic engineering;
    • Correspondence on the value of the Logan River

    • Correspondence from Mark Hill to Stan Nuffer explaining the resource value of the Logan River highlighting three perspectives: recreational, economic, and biological.
    • Logan River (Utah); Logan Canyon (Utah); Rivers--Recreational use--Utah--Logan
    • Correspondence from Citizens for the Protection of Logan Canyon

    • Correspondence from Citizens for the Protection of Logan Canyon representative Stephan Flint discussing the drafted EIS and the how the document could be improved to better reflect the needs and wants of the citizens.
    • Logan Canyon (Utah); Roadside improvement--Utah--Logan Canyon;
    • Grand Targhee

    • "after 11 years of intensive environmental analysis, including two environmental impact statements and various socioeconomic factors, the resort has begun installing the infrastructure to support the Forest Service-approved plans for...
    • Resorts; Landscape architecture; Regional Planning;

QuickView

Display a larger image and more item information when the pointer pauses over a thumbnail
 

Layout options:

Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK
Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK