Skip to main content

Add or remove other collections to your search:



Narrow your search by:



You've searched: All Collections

  • All fields: FHWA
(52 results)



Display: 100

    • Correspondence and status update on Logan Canyon

    • Correspondence from Bryan Dixon to Rudy Lukez, March 28, 1987; correspondence from Jay A. Monson to James (Jim) Naegle; and the Logan Canyon Highway project status and issues with a history of the project, timline, alternatives being considered,...
    • Traffic engineering; Environmental policy; Roads Improvement--Utah--Logan Canyon;
    • Additional data for agenda items from January 26, 1987 Interdisciplinary Team meeting

    • Additional data for agenda items from January 26, 1987 Interdisciplinary Team meeting includes an environmental report schedule, outline for scoping meeting, list of figures for slide presentation for scoping meeting, environmental impact statement...
    • Logan Canyon (Utah); Traffic engineering; Roadside improvement--Utah--Logan Canyon; Roads--Design and construction; United States Highway 89;
    • Environmental Study, scope of work for Logan Canyon

    • Exhibit A of the Logan Canyon environmental study scope of work that lists the numerous tasks to be completed for the project including an analysis of transportation needs such as safety, maintenance, and congestion; location studies from specific...
    • Logan Canyon (Utah); Roadside Improvement--Utah--Logan Canyon; United States Highway 89;
    • Various papers commenting on the Logan Canyon construction project, 1994

    • Various papers commenting on the Logan Canyon construction project, 1994. Included: Citizens for a Safe and Scenic Logan Canyon summary of UDOT plan of action and Conservationist plan of action, time filing lawsuit under NEPA, and comments on Logan...
    • Traffic engineering; Roadside improvement--Utah--Logan Canyon; Logan Canyon (Utah);
    • Memorandum from Stan Nuffer, April 29, 1987

    • Memorandum from Stan Nuffer with the review of traffic forecasts, scoping comments, dates for meetings, technical memorandum on noise and speed analysis.
    • Logan Canyon (Utah); Roads--Design and construction; Traffic engineering;
    • Correspondence from Bruce Pendery to Dave Berg, August 12, 1994

    • Correspondence from Bruce Pendery to Dave Berg stating the reasons why a supplemental environmental impact statement (SEIS) should be prepared, explaining that flawed data and lack of public involvement have made the current EIS unusable. Suggests...
    • Logan Canyon (Utah); Natural resources conservation areas; Traffic engineering; Roadside improvement--Utah--Logan Canyon;
    • Introduction to Highway 89 study

    • An 8 page project introduction by the Utah Department of Transportation (UDOT) that outlines the purpose of the Logan Canyon study, listing three main objectives; the backgroud and description of the Logan Canyon study; a schedule, including a list...
    • Logan Canyon (Utah); United States Highway 89; Utah; Roadside improvement--Utah--Logan Canyon;
    • Minutes from May 18, 1987 Interdisciplinary Team meeting

    • Minutes from May 18, 1987 Interdisciplinary Team meeting. Review of minutes, discussion of the existing conditions portion of the socio-economic technical memorandum, review of the technical memorandum addressing noise, review of the existing...
    • United States Highway 89; Roadside improvement--Utah--Logan Canyon;
    • Minutes from July 31, 1987 Interdisciplinary Team meeting

    • Minutes from the 24th Interdisciplinary Team meeting on July 31, 1987 at UDOT district office in Ogden, Utah. Also included is a corrected Figure 6-1 for Traffic Capacity Technical Memorandum and labeled map, and written comments on Visual...
    • United States Highway 89; Roadside Improvement--Utah--Logan Canyon; Traffic engineering;
    • Minutes from December 8, 1986 Interdisciplinary Team meeting

    • Minutes from December 8, 1986 Interdisciplinary Team meeting. Review of minutes, discussion of issues and concerns, discussion of schedule for completion of the scoping process, update of final visual classification, and layouts for component...
    • United States Highway 89; Roadside Improvement--Utah--Logan Canyon; Traffic engineering;
    • Minutes of June 23, 1986 Interdiscipline Team meeting

    • Minutes of June 23, 1986 Interdisciplinary Team meeting. Review of minutes, discussion of role of Interdisciplinary Team, level of documentation required, public involvement program outline, and the schedule.
    • United States Highway 89; Roadside Improvement--Utah--Logan Canyon;
    • LCC correspondence

    • Multiple correspondences from members of the Logan Canyon Coalition including a notice of appeal and statement of reasons, and discussion of the modifications proposed for Logan Canyon.
    • Logan Canyon (Utah); Environmental policy; Department of Transportation--Utah;
    • Minutes from November 3, 1986 Interdisciplinary Team meeting

    • Minutes from November 3, 1986 Interdisciplinary Team meeting. Review of minutes, discussion of alternate routes to Logan Canyon, discussion of goals and objectives tech memo, alternate alignments from the summit to Garden City, and a preview of...
    • United States Highway 89; Roads--Design and construction;
    • Minutes from March 30, 1987 Interdisciplinary Team meeting

    • Minutes from March 30, 1987 Interdisciplinary Team meeting. Attendance, review of minutes, scoping meeting summaries, discussion of alternatives C1, D1, D2, and D3, aquatic resources and recreation/land use technical memos, and continued...
    • Roads--Design and construction; United States Highway 89; Aquatic resources--Utah--Logan River; Traffic engineering;
    • Minutes from August 25, 1986 Interdisciplinary Team meeting

    • Minutes from August 25, 1986 Interdisciplinary Team meeting. Review of minutes, draft traffic forecast technical memorandum, manual traffic counts, existing roadway features, and general discussion.
    • United States Highway 89; Roadside Improvement--Utah--Logan Canyon; Traffic engineering;
    • Minutes from Logan Canyon field trip

    • Minutes from Interdisciplinary Team field trip on April 21, 1987 where the primary purpose was to get an idea of the magnitude of the changes required, spot improvements were observed but were not the subject of this trip.
    • Roads--Design and construction; United States Highway 89; Logan Canyon (Utah);
    • Alternatives to proposed Logan Canyon construction

    • Several alternatives to the proposed construction in Logan Canyon including: concern over the expansion and curve reduction in Logan Canyon, Agency Alternative, Additions to Conservationists' alternative for US 89, Environmentalists' alternative,...
    • Traffic engineering; Roadside improvement--Utah--Logan Canyon; Logan Canyon (Utah);
    • Minutes from November 17, 1986 Interdisciplinary Team meeting

    • Minutes from November 17, 1986 Interdisciplinary Team meeting. Review of minutes, alternate route technical memo, public involvement summary memorandum, public involvement/scoping meeting, review of existing roadside parking, areas meeting critera...
    • United States Highway 89; Roadside improvement--Utah--Logan Canyon; Roads--Design and construction;
    • Minutes from August 11, 1986 Interdisciplinary Team meeting

    • Minutes from August 11, 1986 Interdisciplinary Team meeting. Randy Nielsen's name added to mailing list. Review of minutes, draft traffic tech memo, manual traffic counts, maintenance information, and accident data.
    • United States Highway 89; Roads Improvement--Utah--Logan Canyon; Traffic engineering;
    • Minutes from October 20, 1986 Interdisciplinary Team meeting

    • Minutes from October 20, 1986 Interdisciplinary Team meeting. Review of minutes, discussion of satety analysis technical memo, study of goals and objectives, discussion of geotechnical investigations, and alternate routes to Logan Canyon.
    • United States Highway 89; Traffic engineering;
    • LCC newletter, "Canyon Wind"

    • Newsletters updating the events of Logan Canyon Coalition including but not limited to the formation of LCC, denial of appeal, violations of FEIS, lifting of the stop work order, and the eligibility of Logan River for wild and scenic designation.
    • Logan Canyon (Utah); Wilderness areas; Public lands--Utah--Logan Canyon;
    • Preliminary Record of Decision, July 14, 1994

    • The preliminary record of decision for US Highway 89, Right Fork in Logan Canyon to Garden City and Final Environmental Impact Statement. The six sections include decision, alternatives considered, section 4(f), measures to minimize harm,...
    • Logan Canyon (Utah); Environmental policy; Roads--Design and construction; Roadside improvement--Utah--Logan Canyon;
    • Record of decision, October 13, 1994

    • Record of decision for US Highway 89 stating that the Federal Highway Administration agrees with the Utah Department of Transportaion in its selection of the Preferred Alternative.
    • Roadside improvement--Utah--Logan Canyon; Roads--Design and construction; Traffic engineering; United States Highway 89; Logan Canyon (Utah); Environmental policy;
    • Compendium of tools for watershed assessment and TMDL development

    • A discussion of methods and tools for gathering data on watersheds, conracted by the EPA and put out in 1997. Contract No. 68-C3-0303.
    • Water--Pollution--United States--Total maximum daily load--Mathematical models; Water--Pollution--United States--Mathematical models; Watershed management--United States--Mathematical models;

QuickView

Display a larger image and more item information when the pointer pauses over a thumbnail
 

Layout options:

Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK
Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK