Skip to main content

Add or remove other collections to your search:



Narrow your search by:



You've searched: All Collections

  • All fields: Neil, John
(14 results)



Display: 100

    • Memorandum from Stan Nuffer, April 29, 1987

    • Memorandum from Stan Nuffer with the review of traffic forecasts, scoping comments, dates for meetings, technical memorandum on noise and speed analysis.
    • Logan Canyon (Utah); Roads--Design and construction; Traffic engineering;
    • Minutes from November 17, 1986 Interdisciplinary Team meeting

    • Minutes from November 17, 1986 Interdisciplinary Team meeting. Review of minutes, alternate route technical memo, public involvement summary memorandum, public involvement/scoping meeting, review of existing roadside parking, areas meeting critera...
    • United States Highway 89; Roadside improvement--Utah--Logan Canyon; Roads--Design and construction;
    • Minutes from November 3, 1986 Interdisciplinary Team meeting

    • Minutes from November 3, 1986 Interdisciplinary Team meeting. Review of minutes, discussion of alternate routes to Logan Canyon, discussion of goals and objectives tech memo, alternate alignments from the summit to Garden City, and a preview of...
    • United States Highway 89; Roads--Design and construction;
    • Minutes from August 25, 1986 Interdisciplinary Team meeting

    • Minutes from August 25, 1986 Interdisciplinary Team meeting. Review of minutes, draft traffic forecast technical memorandum, manual traffic counts, existing roadway features, and general discussion.
    • United States Highway 89; Roadside Improvement--Utah--Logan Canyon; Traffic engineering;
    • Minutes from December 8, 1986 Interdisciplinary Team meeting

    • Minutes from December 8, 1986 Interdisciplinary Team meeting. Review of minutes, discussion of issues and concerns, discussion of schedule for completion of the scoping process, update of final visual classification, and layouts for component...
    • United States Highway 89; Roadside Improvement--Utah--Logan Canyon; Traffic engineering;
    • Minutes from May 18, 1987 Interdisciplinary Team meeting

    • Minutes from May 18, 1987 Interdisciplinary Team meeting. Review of minutes, discussion of the existing conditions portion of the socio-economic technical memorandum, review of the technical memorandum addressing noise, review of the existing...
    • United States Highway 89; Roadside improvement--Utah--Logan Canyon;
    • Minutes from August 11, 1986 Interdisciplinary Team meeting

    • Minutes from August 11, 1986 Interdisciplinary Team meeting. Randy Nielsen's name added to mailing list. Review of minutes, draft traffic tech memo, manual traffic counts, maintenance information, and accident data.
    • United States Highway 89; Roads Improvement--Utah--Logan Canyon; Traffic engineering;
    • Minutes from October 20, 1986 Interdisciplinary Team meeting

    • Minutes from October 20, 1986 Interdisciplinary Team meeting. Review of minutes, discussion of satety analysis technical memo, study of goals and objectives, discussion of geotechnical investigations, and alternate routes to Logan Canyon.
    • United States Highway 89; Traffic engineering;
    • Minutes from July 28, 1986 Interdisciplinary Team meeting

    • Minutes from July 28, 1986 Interdisciplinary Team meeting. Review of minutes, traffic count data, presentation of proposed traffic forecast, highway capacity and level of service determination, review of accident data, and an update on status of...
    • United States Highway 89; Utah; Roadside Improvement--Utah--Logan Canyon;
    • Minutes from July 28, 1986 Interdisciplinary Team meeting

    • Minutes from July 28, 1986 Interdisciplinary Team meeting. Review minutes, traffic count data, presentation of proposed traffic forecast, discussion of highway capacity and level of service determination, review of accident data, and update on...
    • Roadside Improvement--Utah--Logan Canyon; United States Highway 89; Traffic engineering;
    • Minutes of June 23, 1986 Interdiscipline Team meeting

    • Minutes of June 23, 1986 Interdisciplinary Team meeting. Review of minutes, discussion of role of Interdisciplinary Team, level of documentation required, public involvement program outline, and the schedule.
    • United States Highway 89; Roadside Improvement--Utah--Logan Canyon;

QuickView

Display a larger image and more item information when the pointer pauses over a thumbnail
 

Layout options:

Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK
Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK