Summerlin plant materials list (B.3, #175), 1989. Included is 1) Summerlin DWI #88/175 Phase One Schematic Landscape Plan Plant Materials List, May 4, 1989 (1 page), 2) Summerlin, Phase One - Schematic Landscape Plane, Park Loop Road Streetscape,...
Summerlin design sketches (B.7, #586), 1995. Also includes: 1) "The Trails at Summerlin, Single Family Residential Design Criteria" working draft, prepared by Design Workshop PBR G.C. Wallace, September 1, 1992 (50 pages), and 2) Phoenix Products...
Architecture--Designs and plans--Nevada-Las Vegas; Architecture--Designs and plans--Working drawings; Architectural drawing--Nevada--Las Vegas; Drawing--Nevada--Las Vegas; Planned communities--Nevada--Las Vegas;
Regional climate and design considerations project working paper for the Evan-Thomas Development Area, prepared by Design Workshop, Inc., dated June 28, 1979. "This information was compiled to establish the relationship between the climate zone of...
Resort development--Canada--Alberta--Kananaskis; Kananaskis Village (Alta.); Kananaskis (Alta.)--Climate; Architectural design--Alberta--Kananskis;
Summerlin marketing and presentations development standards (D.2, #173), 1988. Included is the Summerlin, Planned Community Program Development Standards, Dec. 13, 1988, Submitted to : The City of Las Vegas, Submitted by: Howard Hughes Properties.
Planned communities--Nevada--Las Vegas; Architecture--Designs and plans--Nevada--Las Vegas; Building sites--Planning;
Final Environmental Impact Statement that addresses the envrionmental consequences of building 4,000 housing units in the Walnut Hills Subdivision in western Salt Lake County, Utah. It identifies adverse impacts that will allow the Department of...
Housing -- Utah -- Salt Lake County; Real estate development -- Environmental aspects -- Utah -- Salt Lake County; Environmental impact analysis -- Utah -- Salt Lake County;
Summerlin marketing and presentation (D.1, #127), 1989. Included is : 1) Draft Outline The Hills at Summerlin Design Criteria, Summerlin, Nevada, April 13, 1989, Prepared for: Howard Hughes Properties (111 pages) and 2) Draft Outline Summerlin...
Planned communities--Nevada--Las Vegas; Architecture--Designs and plans--Nevada--Las Vegas; Building sites--Planning;
Created in France during the late fifteenth century, the illuminations, text, and family genealogy (added by one of many owners) found in De Villers Book of Hours make it an excellent example among other French books of hours from this period. In...
Catholic Church -- Prayers and devotions; Books of hours; Illumination of books and manuscripts -- France
Interstate 15 through the Bear River Valley: Administrative Action Final Environmental Impact Statement. This 227 page document presents the environmental, economic and social impacts of constructing I-15 through northern Utah. Also contains...
Roads -- Utah; Express highways -- Utah; Environmental policy -- Utah; Interstate 15; Bear River Valley (Utah-Idaho) -- Environmental conditions
The existing Glendale Reservoir on Worm Creek would be enlarged from its present capacity of 5,800 acre-feet to 23,000 acre-feet. Water would be brought to the reservoir from Cub River through an enlargement of the Cub-Worm Canal and from Mink...
Water resources development -- Cache Valley (Utah and Idaho); Irrigation -- Cache Valley (Utah and Idaho); Irrigation projects -- Cache Valley (Utah and Idaho);
This Environmental Impact Statement analyzes the environmental impacts of alternatives being considered to deliver increased amounts of water from the enlarged Strawberry Reservoir through the Diamond Fork drainage in north-central Utah for...
Central Utah Project. Bonneville Unit; Electric power systems -- Environmental aspects -- Utah; Hydroelectric power plants -- Environmental aspects -- Utah;